Projects Details

  
Johnson Avenue Bridge Improvements
Pensacola, Florida

Fabre Engineering & Surveying was selected by Escambia County to design and prepare construction plans and contract documents for a 50 foot precast bridge replacement of an existing wood and concrete bridge that was past its design life, and 1,700 linear feet of new sidewalks along both sides of Johnson Avenue.  The sidewalks were designed to meet current ADA and County standards.  The project was permitted through the Northwest Florida Water Management District and the Army Corps of Engineers due to impact to wetlands.  Construction Cost $  887,000.00