Projects Details

  
Century Industrial Park
Century, Florida

Fabre Engineering & Surveying provided surveying and engineering services including design, preparation of construction plans and contract documents, permitting, construction monitoring and contract administration for the Industrial Park located in Century, Florida.  Our services included master planning; surveying; water, wastewater, stormwater, and road design; and construction administration.  The project included a stormwater retention pond, 3,800 feet of 8 inch watermain, 3,330 feet of 8 inch gravity sewer line, 1,580 feet of 6 inch force main, 4,535 feet of concrete ditch, 4,000 feet of roadway design, and 500 feet of 30 inch diameter reinforced concrete pipe.  Fabre Engineering & Surveying applied for and the Town of Century received grants from the Economic Development Administration, and Housing and Urban Development to fund the project.  Construction Cost:  $1,200,000.00