Projects Details

  
Magnolia West
Perdido Key, Florida

This project was a 24 acre mixed-use three phase development on Perdido Key.  The project included 26,000 SF of commercial (retail and office space) in a 3 story low rise building and  22 single family condominium units in a 6-story high-rise building in Phase 1; 44 single family residences in Phase 2; and 45 time-share units in a 10-story high rise and five detached cottages in Phase 3. 

Fabre Engineering & Surveying was responsible for all civil engineering aspects of this project including surveying, preliminary planning, infrastructure design (water, sewer, roadways, parking, drainage, etc.), and project design team management and coordination.  Fabre Engineering & Surveying also was responsible for permitting the project with Escambia County DRC, FDOT (Drainage and Driveway Connection), Florida Department of Environmental Protection (Stormwater, and National Pollutant Discharge Elimination System), and Emerald Coast Utilities Authority.  Fabre Engineering and Surveying has also provided permitting support services to the subconsultant completing the Dredge and Fill permitting with the County, FDEP, and Army Corps of Engineers and the Beach Mouse permitting with the Florida Fish and Wildlife Conservation Commission and the US Department of the Interior Fish and Wildlife Service