Fabre Engineering & Surveying

Chili’s – Fort Walton Beach

Fabre Engineering & Surveying designed the site work to support the Chili’s Restaurant on Mary Esther Cutoff.  The design included pavement, grading, drainage, parking, and utilities.  The drainage and stormwater treatment design involved the innovative use of underground storage and treatment as room for improvements was scarce.  The retention and treatment system is contained in custom designed vaults under the parking lot.  The design of the vaults meets FDEP, FDOT, and City requirements and provides for maintenance of the structure.


Categorised as: Site Development


Comments are closed.

© Copyright 2017 | Fabre Engineering, Inc. | All Rights Reserved Worldwide | Site Map