Fabre Engineering & Surveying

Fairground Road, Molino, Florida

The total length of the project is approximately 1.1 miles.  Fabre Engineering & Surveying performed a certified Topographic Survey that met the current Florida Minimum Technical Standards as set forth by the Board of Professional Surveyors and Mappers.  The purpose of the survey was for the design of a minimum 60’ right-of-way roadway alignment, widening, and drainage improvements.  Also, performed property acquisition and utility location along the route.


Categorised as: Surveying


Comments are closed.

© Copyright 2017 | Fabre Engineering, Inc. | All Rights Reserved Worldwide | Site Map