Fabre Engineering & Surveying

Ogden/Hartung Drainage – Survey Scope

Fabre Engineering & Surveying performed a 5,390 linear foot Topographic Survey that meets the current Florida Minimum Technical Standards as set forth by the Board of Professional Surveyors and Mappers to support the development of plans, specifications, and permitting for construction of drainage improvements for the Ogden Hartung Subdivision.  Benchmarks referenced to NAVD 1988 Datum, were set every 1000 feet, cross-section data was collected every 100 feet.  Topographic data was taken from right-of-way to right-of-way and extended by a minimum of 5 feet to ensure complete DTM coverage of right-of-way.  Road rights-of-way and parcel lines depicted on topographical survey were based on field located property corners.


Categorised as: Surveying


Comments are closed.

© Copyright 2017 | Fabre Engineering, Inc. | All Rights Reserved Worldwide | Site Map