Fabre Engineering & Surveying

Fort Walton Beach Waste Transfer Station Drainage Improvements

Fort Walton Beach Waste Transfer Station Drainage ImprovementsThis project consisted of Preliminary Planning and Engineering, Permitting and Surveying Services for the Fort Walton Beach BFI Waste Transfer Station Drainage Improvements. The project objective was to minimize the direct contact of garbage and stormwater runoff. The project also included roofing of the WTS tipping floor and the addition of curbing along the concrete approaches to the tipping floor to control and direct stormwater into the ponds. The scope of services included the development of Civil Construction Plans, Cost Estimating and Stormwater Narrative.


Categorised as: Transportation and Stormwater


Comments are closed.

© Copyright 2017 | Fabre Engineering, Inc. | All Rights Reserved Worldwide | Site Map