Fabre Engineering & Surveying

Gulf Breeze Sewer Improvements

Fabre Engineering & Surveying is currently providing Engineering and Surveying services for the construction of a wastewater collection/transmission system to serve single family homes involving the installation of gravity pipeline, manholes, duplex submersible pump lift stations and force mains.  The estimated amount of this CDBG is $500,000.00 with a $750,000.00 contribution from the City.


Categorised as: Transportation and Stormwater


Comments are closed.

© Copyright 2017 | Fabre Engineering, Inc. | All Rights Reserved Worldwide | Site Map