Camp Ema-Chame Wastewater Treatment Plan

This project consisted of planning, design, permitting, construction administration and inspection of a centralized, 15,000 GPD wastewater collections, treatment, and disposal system for the troubled youth offenders’ resident camp, located in Blackwater Forest.  The collection system was designed to be a gravity system.  The wastewater treatment plant is an in-ground, pre-fabricated, low maintenance, secondary plant.  Effluent disposal is by a rapid filtration basin.  The entire system was designed to be low maintenance and environmentally friendly, due to the location.  Our provided services included: Planning, Design, Plan Preparation, Permitting, Construction Monitoring, and Contract Administration.


Categorised as: Wastewater