This project includes planning, alternate site selection analysis, design, construction cost estimates, and construction administration for a 200,000 gallon per day, advanced wastewater treatment (AWT) and reuse facility. Present worth analysis of alternate treatment systems resulted in the selection of an extended aeration plant with anerobic and anoxic stages plus tertiary filtration to yield an effluent meeting advanced wastewater treatment criteria and suitable for residential reuse. Alternate reuse systems evaluated were rapid infiltration and spray irrigation. Services included: Surveying, Master Planning, Design, Permitting and Construction Administration. Estimated Construction Cost – $3,000,000.00