Holley-Navarre Water System Wastewater Treatment Plan and Effluent Reuse: 0.5 MGD

Holley-Navarre Water System Wastewater Treatment Plant and Effluent ReuseFabre Engineering & Surveying provided professional engineering and surveying services for the original wastewater system in the Holley-Navarre Water System franchised area. The project consisted of a 0.5 MGD extended aeration, wastewater treatment plants with tertiary filtration, together with nine major lift stations, twenty miles of sewer collection lines, and a reuse spray irrigation system at Hidden Creek Golf Course constituted the original $2.5 million sewer system for the Holley-Navarre franchise area. Fabre Engineering & Surveying services included: Development of Grant/Loan Assistance, Tap-on Pre-Sale Program, Master Planning, Design, Preparation of Construction Plans and Specifications, Permitting, Construction Administration.