Magnolia/19th Street Sewer Rehabilitation

Magnolia / 19th Street Sewer RehabilitationThis project is in the design phase and is being completed for Emerald Coast Utilities Authority (ECUA). The project scope includes the evaluation of approximately 4,500 LF of 4-inch, 6-inch, and 8-inch clay gravity sewer located in residential easements (backyards) and under existing roadways. The proposed project includes pipe bursting to upsize the 4-inch and 6-inch lines to 8-inch, as well as point repairs, CIPP lining of the 8-inch lines, manhole rehabilitation, and service renewal. Estimated Construction Cost: $500,000.00