Pace Wastewater Treatment Upgrade

The treatment plant expansion consisted of the addition of a new Carrousel oxidation ditch, an anaerobic selector for biological phosphorus removal, chemical addition facilities, a 1.0 MGD clarifier, a 1.0 MGD filter, expansion of existing chlorine contact chamber, and a new 1.0 MGD digester.  The expansion also makes provisions for upgrade to AWT by providing for the future construction of second stage anoxic and reaeration basins.  Plant hydraulic design and the location of piping and structures will facilitate upgrade to AWT should that become necessary or desirable.  Construction cost was approximately $2.2 million.  Fabre Engineering & Surveying provided services included:  Planning, Design, Preparation of Construction Plans & Specifications, Permitting, Construction Monitoring, and Contract Administration.

 


Categorised as: Wastewater


Comments are closed.

© Copyright 2017 | Fabre Engineering, Inc. | All Rights Reserved Worldwide | Site Map