Fabre Engineering & Surveying

Rehabilitation Of Seaglades Lift Station #159

Rehabilitation of Seaglades Lift Station #159This project is in the design phase and is being completed for Emerald Coast Utilities Authority (ECUA). This project includes the rehabilitation of a 14-foot diameter concrete wetwell that is failing due to corrosion by sewer gasses. The planned repair will include a permanent fiberglass insert which will allow for a safe working environment while the lift station plumbing is re-constructed and a corrosion resistant wet well structure for future operation.


Categorised as: Wastewater


Comments are closed.

© Copyright 2017 | Fabre Engineering, Inc. | All Rights Reserved Worldwide | Site Map