South Walton Utility AWT Wastewater Treatment Plant Expansion and Effluent Reuse: 2.5 MGD

South Walton Wasterwater Plant Expansion

Master planning, design, permitting, cost estimating, and construction inspection of the custom, reinforced concrete, advanced wastewater treatment plant with a capacity of 2.5 MGD.  The $2.5 million project consisted of mechanical screening, flow equalization, nitrogen removal, Carrousel oxidation ditch, clarification, tertiary filtration, rapid infiltration, and reuse spray irrigation.  This was one of the first Carrousel oxidation ditches in the Southeast.