Fabre Engineering & Surveying

Fairpoint Regional Utility System Water Supply Master Plan and Feasibility Study

Fairpoint Regional Utility System Water Supply Master Plan and Feasibility StudyIn response to growing water demands and limited coastal aquifer supply, the City of Gulf Breeze joined with Holley-Navarre Water System and Midway Water System to form a regional water supply entity.

  • Project consisted of developing water supply wells east of Milton, Florida, piping water south along the State Route 87 corridor, across the Yellow River and Eglin AFB, and interconnecting with the existing utility systems.
  • Fairpoint Regional Utility System Water Supply Master Plan and Feasibility StudyProject was designed to provide a 20+ year water supply for residents and businesses within a 53-mile service area. The design anticipated an inland well field consisting of seven (7) wells, capable of pumping from the sand and gravel aquifer.

Phase I of the project included five production wells with approximately 16 miles of 24-inch water transmission main, seven (7) miles of 18-inch water transmission, a new 300,000 gallon elevated storage tank, and a booster pump station.

Fairpoint Regional Utility System Water Supply Master Plan and Feasibility StudyFabre Engineering & Surveying services included: Feasibility Study, Master Plan, Preliminary Engineering Report, Groundwater Modeling, Surveying, Engineering Design, Permitting, Funding through the State Revolving Fund and the Environmental Protection Agency, Construction Administration, and Start-up Assistance. Construction cost: $19 million.

 


Categorised as: Water


Comments are closed.