Holley-Navarre Water System, Inc. Utility Relocation – Segment 5

Holley-Navarre Segment 5 Utility RelocationThis project consisted of the installation of 1,000 LF of 24” DIP and 150 LF of 16” DIP water line for the purpose of avoiding conflict with FDOT widening of State Road 87 in Santa Rosa County, Florida.  The scope of services included engineering design, contract administration, construction plans and specifications, contract documents, FDEP and FDOT permitting, opinion of probable cost, and construction inspection.