Fabre Engineering & Surveying

Holley-Navarre Water System Tank No. 6

Holley-Navarre Tank No. 6This project was constructed under Contracts I & II.  Contract I consisted of the installation of a 300,000 gallon pedespheroid elevated tank with an alternate for a toro ellipsoidal design.  Contract II consisted of the installation of 1,100 LF of 10” PVC water main, an automatic control valve and vault, and related sitework at the tank site.  This contract also included the installation of an altitude valve and vault and a check valve and vault at a remote location.


Categorised as: Water


Comments are closed.

© Copyright 2017 | Fabre Engineering, Inc. | All Rights Reserved Worldwide | Site Map