Midway Water System Elevated Tank And Meter Read System

In 2006 Midway Water System was placed under consent order by FDEP for lack of water system storage.  Fabre Engineering & Surveying applied for, and received, an FDEP SRF loan for $1.8 million for the construction of a 1.0 million gallon elevated storage tank and an automated meter read system.  Fabre Engineering & Surveying provided all planning, design, permitting, contract administration, grant administration and inspection.


Categorised as: Water