Fabre Engineering & Surveying

Midway Water System

Midway Water SystemFabre Engineering & Surveying has provided all water engineering and surveying services for Midway Water System since 1997.  Fabre Engineering & Surveying services provided include:

  • 1998 Midway Master Plan
  • 1999 Water System Improvements
  • Well #8 Upgrade
  • 6” Fire Hydrant Addition
  • Pump Station #2 Building, Upgrade and Permit Extension
  • Station #2 Re-design
  • Station #3 Rehabilitation
  • Tank #4 Overflow Drain
  • Waterline Extensions Surveying
  • Test Well #4 Surveying
  • Vulnerability Assessment & ERP
  • Wheeler Road Tank Conditional Use
  • 4761 Gulf Breeze Parkway
  • Beaver Pond Road Waterline Extension
  • Church Street Waterline Extension
  • Warehouse Construction Staking
  • Consumptive Use Permit Renewal
  • FDOT Permitting for Hwy 98 Fire Hydrants
  • Well and Elevated Tank #4 Repairs and Repainting
  • Elevated Tank #5
  • Station #1 As-Built Drawings
  • Midway/Holley-Navarre Interconnect
  • Well #8 Redevelopment
  • 2000 Water System Improvements
  • 2003 Utility Relocation on State Road 87
  • Warehouse and Parking Lot Improvements
  • Midway State Revolving Fund Application
  • 2006 Radio Read Meter Improvements
  • Upgrades for Fire Protection
  • Navarre Beach Chlorination System
  • 2007 Waterline Improvements
  • Water Supply Analysis
  • Midway Office Survey
  • Pine Street Waterline Improvements
  • SCADA Control Elevation Drawings

Categorised as: Wastewater, Water


Comments are closed.

© Copyright 2017 | Fabre Engineering, Inc. | All Rights Reserved Worldwide | Site Map