Town Of Century
Fabre Engineering & Surveying has provided all wastewater and potable water engineering and surveying services for the Town of Century since 1989. Fabre Engineering & Surveying services provided include:
- The Original 0.45 MGD Wastewater Collection System
- 2006 CDBG Lift Station Generators
- 2008 Rural Development Improvements
- McCall, Backwoods, and Fannie Road Water Line Extensions
- City Wide Paving and Stormwater
- 2002 Wastewater Facilities Grant
- 2003 Wastewater Treatment Plant Improvements
- .0675 Wastewater Treatment Plant Expansion
- Agriculture Use Plan
- Capacity Analysis Report
- CUP Renewal
- Water and Wastewater Plant No.3 and Tank No. 2
- Century Prison Booster Station
- Northern Century Drainage Improvements
Categorised as: Wastewater, Water