Projects Details

  
Tate High School Pump Station Retrofit
Cantonment, Florida

Fabre Engineering & Surveying provided Professional Engineering and Surveying services for the evaluation and retrofit of the existing Tate High School Pump Station. Existing pumping capacity of the station was measured and a report of our findings was presented to the District recommending upgrades.  The upgrades included two new pumps and control panel for the lift station.

Our scope of services included surveying, design, preparation of construction plans and specifications, surveying and permitting through ECUA and FDEP for the upgrades to the existing lift station.  Preparation of record drawings, certification of completion of the work, and the submittal to FDEP for final permit certification was also provided.